Know what a site allows before you sign the lease.
What can open there, how big you can build, how much parking you need, which overlays apply and how long the permit will take, read from each city's own code and records. Every answer quotes its source, and every number is checked.
One site, three questions
Opening a store, a restaurant or a clinic turns on the same questions everywhere. We answer them for an address, from the city's own documents.
Zoning
Allowed uses, height, setbacks, lot size, coverage, parking and overlays for the lot.
- Use lookup · 8 cities
- Full zoning report · preview
- Cambridge lot memo
Permits
The approval route a change of use needs, and how long that kind of permit really takes.
- Permit times · 27 places
- Change of use · Cambridge
- What reviewers send back · Seattle
Rollouts
A list of addresses becomes a permit plan: who issues each permit and when to expect it.
- Rollout planner · any US address
Products
Each one is built on public records and says what it does not know.
Zoning report
Preview · Durham, Raleigh, New OrleansOne page for one address: uses, dimensional limits, parking and overlays that apply to that lot, each with the code's exact words, and the existing building checked against them.
Use lookup
Live · 8 citiesCan this business open at this address? Allowed, allowed with standards, needs approval or not allowed, with the use table's row and the footnote that changes the answer.
Permit times
Live · 27 placesHow long commercial fit-out permits take, from each place's own permit records, one method everywhere, each estimate checked on later permits.
Rollout planner
Live · any US addressPaste a store list: each address is matched to the authority that issues its permit, given that authority's measured wait, and put in the order permits should come back.
Change of use
Live · CambridgeCan this space become a restaurant? Allowed, special permit or not allowed in the ordinance's words, with the footnotes that change the answer and how long permits have taken.
Plan review insights
Research · SeattleWhy plan review sends work back, what reviewers flag first, and correction letters turned into task lists, with every code section checked against the reviewer's words.
How it works
Zoning reports are written by hand, city by city, and take weeks. We compile them: the code is read once, deeply, and every lot is answered from it.
From the city's own website, obeying what the site allows, down to every table of uses, dimensions and parking.
Two AI models read each table separately. A number stands only when both give it from the same cell, with the cell's exact words.
The city's maps say which district, tier and overlays a lot is in, so a rule meant for one part of a district never answers for another.
Independent blind checks, and the permits the city actually issued. What can't be read is listed, never guessed.
Coverage
Depth before breadth: a city is listed once each layer is read and checked.
| Place | Uses | Height & setbacks | Parking | Overlays on the lot | Permit times |
|---|---|---|---|---|---|
| Cambridge, MA | Yes | Yes · every residential lot | — | — | Yes |
| Durham, NC | Yes | Preview | Preview | Preview | — |
| Raleigh, NC | Yes | Preview · every lot | Preview | — | Yes |
| New Orleans, LA | Yes | Preview | Preview | — | Yes |
| Charlotte, Albuquerque, Portland, San Diego, Denver | Yes | — | — | — | — |
| 24 more cities and counties | — | — | — | — | Yes |
Who it's for
Restaurant, retail and clinic chains screening many sites at once.
What a space can legally become, before the tour.
The envelope and parking a lot allows, with the clause behind each limit.
The route and the realistic wait, from the city's own records.
Early access
We are adding cities in depth. Tell us the addresses you care about.